Disturbance

Planned power outage

Details

Biologihuset (J0008001), Fysiologihuset (J0008007), Cykelgarage (J0008022)
Monday 2 February, 2026 - Tuesday 3 February, 2026

Planned power outage on the 2/2 to 3/2.

The planned power outage is caused by maintenance on an existing switchgear within the building "Station 1". The power outage will affect engine heater poles in the parking lots outside of the Biology and Physiology buildings as well as exterior lighting. The maintenance is expected to be completed Tuesday, 3/2.

During the power outage it will be possible to park with a valid parking permit at the parking directly west of IKSU if you are in the need of a functioning engine heater pole. If you do not have the need of a functioning engine heater pole you are free to park on the affected parking lots as usual.